With this sub-project is planned reconstruction of the existing asphalt road and sidewalk.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16A -7sm
- Installing curb/edge concrete elements
- Constructing concrete access culvert.
- Constructing asphalt concrete channel – rigola
- Installing pipes for optical cable.
10. Mapping with horizontal and vertical signalization