With this sub-project is planned reconstruction of the existing asphalt road
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16a -6,5sm
- Installing curb/edge concrete elements
- Constructing concrete access culvert and pipes for drainage the storm water to the recipient
- Mapping with horizontal and vertical signalization.