Reconstruction of part of the street Mice Kozar

With this sub-project is planned reconstruction of the existing   asphalt road. With the reconstruction are planned the next activities:

  1. Marking the route of the new planned sub – project.
  2. Scratching the existing wearing course.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing a curb/edge concrete element.
  8. Leveling the existing manholes.
  9. Installing pipes for optical cable.
  10. Mapping with horizontal and vertical signalization.