Reconstruction of an access road to a new City Cemetery

With this sub-project is planned reconstruction of the existing asphalt road and sidewalk.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16a -7sm
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing curb/edge concrete elements
  8. Constructing sidewalk with paver elements.
  9. Constructing surface earth channels, pipes and concrete access culvert for drainage the storm water to the recipient
  10. Mapping with horizontal and vertical signalization