Reconstruction of local road v.Gabrevci

With this sub-project is planned reconstruction of the existing asphalt road.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 – 8,0 sm
  6. Constructing concrete access culvert.
  7. Mapping with horizontal and vertical signalization

Reconstruction of local road D. Lipovik – G. Lipovik

With this sub-project is planned reconstruction of  the existing asphalt road.With the reconstruction are planned the next activities:

  1. Removing the existing surface course , the existing base course and part of the subgrade, removing the existing sidewalks.
  2. Marking the route of the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing two layers of asphalt
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing a curb/edge concrete elements
  8. Constructing new sidewalks, reconstruction and extending of the existing ones.
  9. Leveling the existing manholes
  10. Installing pipes for optical cable
  11. Construction of access culvert for drainage the storm water to the recipient.
  12. Mapping with horizontal and vertical signalization