With this sub-project is planned reconstruction of the existing dirt road and sidewalks.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- 2 Removing the existing dirt layer.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16a – 7,0 sm
- Installing contrite gutter water cannels
- 7. Mapping with horizontal and vertical signalization.
With this sub-project is planned reconstruction of the existing asphalt road (crossroad) and sidewalks.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 22ca -7,0sm
- Layer of AB 11 – 5,0sm
- Spraying with bituminized emulsion in between the layers.
- Installing curb/edge concrete elements
- Constructing sidewalks with paver elements.
- Leveling the existing manholes
- Mapping with horizontal and vertical signalization
With this sub-project is planned reconstruction of the existing asphalt road (crossroad) and sidewalks.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 22ca -7,0sm
- Layer of AB 11 – 5,0sm
- Spraying with bituminized emulsion in between the layers.
- Installing curb/edge concrete elements
- Constructing sidewalks with paver elements.
- Leveling the existing manholes
- Mapping with horizontal and vertical signalization