Reconstruction of local road to v.Zlesti – v.Belchishta

With this sub-project is planned reconstruction of the existing dirt road and constructing new sidewalks.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing dirt layer, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 – 7sm
  6. Side – hunching for road stabilization
  7. Constructing side earth channel for drainage the storm water to the recipient.
  8. Constructing concrete access culverts.
  9. Mapping with horizontal and vertical signalization.