Reconstruction of streets in village Dvoriste – Berovo

With this sub-project is planned reconstruction of  the existing asphalt / dirt road. With the reconstruction are planned the next activities:

  1. Marking the route of the new planned sub – project.
  2. Removing the existing asphalt and dirt.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing one layer of asphalt:
    • wearing course
  6. Installing pipes for optical cable.
  7. Constructing surface concrete channels and access culvert for drainage the storm water to the recipient.