Reconstruction of streets in village Dvoriste – Berovo

Active
Budget

29239506.4mkd

Length

2,906.22m

Width of asphalt road

3,5m

With this sub-project is planned reconstruction of  the existing asphalt / dirt road. With the reconstruction are planned the next activities:

  1. Marking the route of the new planned sub – project.
  2. Removing the existing asphalt and dirt.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing one layer of asphalt:
    • wearing course
  6. Installing pipes for optical cable.
  7. Constructing surface concrete channels and access culvert for drainage the storm water to the recipient.

Gallery

IMG-cfe5b864c2b63d0f5c2d6a39791abfd6-V

27-08-2021

IMG-335648c159cd6732691bb98b6f95d716-V

27-08-2021

IMG-9882f1fe890ca37efd2cd2dacb3c7b7b-V

27-08-2021

IMG-369c4515bd6251c3fc8ebc099e75f908-V

27-08-2021

IMG-50dd7757bcd218305ffd0c8f94a1e815-V

27-08-2021

IMG-25e0b04492baee3079c8100f31fc2d0b-V

27-08-2021

IMG-7a07d8e2c1f26b4eb66c41dabdee7016-V

27-08-2021

IMG-06b6b41e1f41938ec0b67ed481dbb44b-V

01-01-1970

13

27-08-2021

12

01-01-1970

поставен Механизам за жалби и поплаки во опоштина Берово

01-06-2021

Situation

Before the start of construction works
After competition of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint