Satelite view

Reconstruction of street Mirce Gjockov – Bogdanci

Active
Budget

mkd

Length

158.71m

Width of dirt road

5,0m

With this sub-project is planned reconstruction of the existing dirt road. With the reconstruction are planned the next activities:

  1. Removing the existing dirt surface
  2. Marking the route of the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing one layer of asphalt
    • wearing course
  6. Installing a curb/edge concrete elements
  7. Constructing new sidewalks, reconstruction and extending the existing ones.
  8. Leveling the existing manholes
  9. Installing electricity and pipes for optical cable
  10. Mapping with horizontal and vertical signalization

Gallery

поставен механизам за жалби ипоплаки во општина Богданци

24-08-2021

Situation

Before the start of construction works
After competition of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint