Satelite view

Reconstruction of street Ilindenska

Active
Budget

13055760mkd

Length

612.00m

Width of asphalt road

12,0m

Sidewalks

2x4m

With this sub-project is planned reconstruction of the existing asphalt road and part of the street sidewalks. With the reconstruction are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade, removing the existing sidewalks.
  2. Marking the route from the surveyor from the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with emulsion in between the layers.
  7. Installing a curb/edge concrete element.
  8. Reconstruction of existing sidewalks with paver elements.
  9. Leveling the existing manholes.
  10. Installing pipes for optical cable.
  11. Mapping with horizontal and vertical signalization.

Gallery

IMG-5c3cee0e9f620c2be117268451a173ad-V

10-10-2021

IMG-3c2f50bf04762efb9154e8027f99604a-V

10-10-2021

20211028_113836

10-10-2021

20211026_131450

10-10-2021

20211026_131350

26-10-2021

20211019_090947

19-10-2021

20211006_134930

06-10-2021

20211006_134842

10-10-2021

20210922_083248

22-09-2021

20210922_083237

22-09-2021

20210723_101226

23-07-2021

20210723_101208

23-07-2021

20210714_133033

14-07-2021

20210714_132600

14-07-2021

20210714_132418

14-07-2021

20210714_100423

14-07-2021

20210714_100349

14-07-2021

мерки за БЗР и инфо за проектот во општина кавадарци

04-04-2021

поставен механизам за жалби и поплаки во општина Кавадарци

04-04-2021

Situation

Before the start of construction works
After competition of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint