Width of asphalt road
6,0m
Sidewalk (two sides)
W=2x1,50m
With this sub-project is planned reconstruction of the existing asphalt road, and the sidewalks
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Scratching the existing layer of asphalt
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16 -7,0sm
- Layer of AB 11 – 4sm
- Spraying with bituminized emulsion between the layers.
- Installing curb/edge concrete elements
- Constructing concrete channels, access culvert and pipes for drainage the storm water to the recipient
- Leveling the existing manholes
- Constructing sidewalks with paver elements
- Mapping with horizontal and vertical signalization.