Reconstruction of local street Hristijan Todorovski Karpos

Active
Budget

15131812.87mkd

Length

550.0m

Width of asphalt road

6,0m

Sidewalk (two sides)

W=2x1,50m

With this sub-project is planned reconstruction of the existing asphalt road, and the sidewalks

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Scratching the existing layer of asphalt
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 -7,0sm
    2. Layer of AB 11 – 4sm
  6. Spraying with bituminized emulsion between the layers.
  7. Installing curb/edge concrete elements
  8. Constructing concrete channels, access culvert and pipes for drainage the storm water to the recipient
  9. Leveling the existing manholes
  10. Constructing sidewalks with paver elements
  11. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After competition of construction works