Satelite view

Reconstruction of local street Orce Nikolov and Skopska street

Active
Budget

5071722mkd

Length

500,0m & 250,0m

Street Orce Nikolov - Width

6,0m

Sidewalk (two sides)

2 x 2,0m


Street Skopska - Width

5,5m

Sidewalk (two sided)

2 x 1,5m

With this sub-project is planned reconstruction of the existing asphalt road and sidewalk.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Layer of AB 11 – 5,0sm
  6. Installing curb/edge concrete elements
  7. Leveling the existing manholes.
  8. Constructing sidewalk with paver elements.
  9. Mapping with horizontal and vertical

Gallery

Situation

Before the start of construction works
After competition of construction works

Documents

GRIEVANCE REDRESS MECHANISM

file a complaint