Active
Width of asphalt road
7,0m
Existing sidewalks (two sided)
876.00 m
With this sub-project is planned reconstruction of the existing asphalt road, and extending sidewalks. With the reconstruction are planned the next activities:
- Removing the existing surface course, the base course, part of the subgrade and removing the existing sidewalks.
- Marking the route of the new planned sub – project.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing two layers of asphalt
- binder course
- wearing course
- Spraying with bituminized emulsion in between the layers.
- Installing a curb/ edge concrete elements
- Reconstructing the existing sidewalks with paver elements.
- Leveling the existing manholes
- Installing pipes for optical cable
- Mapping with horizontal and vertical signalization