Reconstruction of Local Street: Goce Stojcevski – Tetovo

Active
Budget

7864372.8mkd

Length

294.00m

Width of asphalt road

6,0m - 7,0m

Sidewalks

0,5m - 3,0m

With this sub-project is planned reconstruction of the existing asphalt road and sidewalks. With the reconstruction are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade, removing the existing sidewalks.
  2. Marking the route from the surveyor from the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing a curb/edge concrete element.
  8. Reconstruction of the existing sidewalks with paver elements.
  9. Leveling the existing manholes.
  10. Installing pipes for optical cable.
  11. Mapping with horizontal and vertical signalization.

Gallery

1

24-04-2021

2

24-04-2021

3

24-04-2021

4

24-04-2021

5

02-06-2021

7

27-04-2021

8

27-04-2021

9

29-05-2021

10

01-06-2021

11

06-06-2021

13

16-06-2021

14

08-06-2021

15

08-06-2021

16

23-06-2021

17

23-06-2021

18

23-06-2021

19

23-06-2021

20

23-06-2021

21

23-06-2021

22

23-06-2021

Situation

Before the start of construction works
After competition of construction works