Satelite view

Reconstruction of local street Boris Kidrich

Active
Budget

28531351.33mkd

Length

830.0m

Width of asphalt road

5,5m to 9,5m

Sidewalk (two side)

W=2,0m-6m

With this sub-project is planned reconstruction of the existing asphalt road (crossroad) and sidewalks.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 22ca -7,0sm
    2. Layer of AB 11 – 5,0sm
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing curb/edge concrete elements
  8. Constructing sidewalks with paver elements.
  9. Leveling the existing manholes
  10. Mapping with horizontal and vertical signalization

Gallery

Situation

Before the start of construction works
After competition of construction works