Rehabilitation of Local Road: Mavrovi Anovi – Vrben

Active
Budget

44448291.00mkd

Length

7,260.0m

Width of asphalt road

3,5m

With this sub-project is planned reconstruction of the existing asphalt road, and the sidewalks

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Scratching the existing layer of asphalt
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 -7,0sm
  6. Installing curb/edge concrete elements
  7. Constructing concrete channels, access culvert and pipes for drainage the storm water to the recipient
  8. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After competition of construction works