Active
Width of existing dirt road
3,5m
Width of the new planned asphalt road
3,5m
With this sub-project is planned reconstruction of existing dirt road.
With the reconstruction are planned the next activities:
- Removing the existing dirt layer, the existing base course and part of the subgrade.
- Marking the route from the surveyor from the new planned sub – project.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 22 -7sm
- Layer of AB 11 – 4sm
- Installing curb/edge concrete elements
- Mapping with horizontal and vertical signalization