Reconstruction of local road Delchevo-Trabotivishte L-1

Active
Budget

27492691mkd

Length

5300m

Width of existing dirt road

3,0m

Haunching two sides

60-75cm


Width of new planned asphalt road

4,0m

With this sub-project is planned reconstruction of the existing dirt road.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing dirt layer, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16a -7sm
  6. Installing curb/edge concrete elements
  7. Constructing concrete access culvert.
  8. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After competition of construction works