Satelite view

Reconstruction of part of the street Mice Kozar

Active
Budget

1889110mkd

Length

276.00m

Width

7,0m

With this sub-project is planned reconstruction of the existing   asphalt road. With the reconstruction are planned the next activities:

  1. Marking the route of the new planned sub – project.
  2. Scratching the existing wearing course.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing a curb/edge concrete element.
  8. Leveling the existing manholes.
  9. Installing pipes for optical cable.
  10. Mapping with horizontal and vertical signalization.

Gallery

20211006_144848

10-10-2021

20211006_144841

10-10-2021

20211006_144836

10-10-2021

20211006_144729

10-10-2021

20210927_143104

02-09-2021

20210927_142216

09-09-2021

20210927_142105

09-09-2021

20210906_130612

09-09-2021

20210906_130531

09-09-2021

20210906_130413

06-09-2021

20210812_143052

08-08-2021

20210812_142831

08-08-2021

20210420_103202

04-04-2021

Бети

04-04-2021

поставен механизам за жалби и поплаки во општина Приелп

05-08-2021

Situation

Before the start of construction works
After competition of construction works

GRIEVANCE REDRESS MECHANISM