Reconstruction of part of the local st. Metodija Andonov Cento in the village Mrzenci

Active
Budget

10525000mkd

Length

839.00m

Width of asphalt road

6,0m to 7,0m

With this sub-project is planned reconstruction of the existing asphalt road

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
  6. Bituminized asphalt layer BNS 16a -6,5sm
  7. Installing curb/edge concrete elements
  8. Constructing concrete access culvert and pipes for drainage the storm water to the recipient
  9. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After competition of construction works