Satelite view

Reconstruction of Kiro Gligorov Blvd. to the overpass on Aleksandar Makedonski Blvd., phase 1

Active
Budget

37887272.00mkd

Length

730.0m

Width of asphalt road

7,0m

With this sub-project is planned reconstruction of the existing asphalt road.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Scratching the existing layer of asphalt
  3. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  4. Leveling, planning and compacting the subgrade until needed.
  5. Leveling and compacting the base course with crushed stone until needed
  6. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 22ca -7,0sm
    2. Layer of AB 11 – 5sm
  7. Spraying with bituminized emulsion between the layers.
  8. Leveling the existing manholes
  9. Electrical installations
  10. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After competition of construction works

Documents

GRIEVANCE REDRESS MECHANISM

file a complaint