Width of asphalt road
9,0m
Sidewalks (two sides)
0,5m – 2m
With this sub-project is planned reconstruction of the existing asphalt road, extending the existing sidewalks. With the reconstruction are planned the next activities:
- Removing the existing surface course, the existing base course and part of the subgrade and removing the existing sidewalks.
- Marking the route of the new planned sub – project.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing two layers of asphalt:
- binder course
- wearing course
- Spraying with bituminized emulsion in between the layers.
- Installing curb/edge concrete elements.
- Constructing new sidewalks, reconstruction and extending the existing ones.
- Leveling the existing manholes.
- Installing pipes for optical cable.
- Mapping with horizontal and vertical signalization.