Satelite view

Local Street Kuzman Shapkarev – Gjorce Petrov

Active
Budget

10160326mkd

Length

349.35

Width of asphalt road

9,0m

Sidewalks (two sides)

0,5m – 2m

With this sub-project is planned reconstruction of the existing asphalt road, extending the existing sidewalks. With the reconstruction are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade and removing the existing sidewalks.
  2. Marking the route of the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing curb/edge concrete elements.
  8. Constructing new sidewalks, reconstruction and extending the existing ones.
  9. Leveling the existing manholes.
  10. Installing pipes for optical cable.
  11. Mapping with horizontal and vertical signalization.

Gallery

1А

26-05-2021

1

09-06-2021

2

09-06-2021

2А

26-05-2021

2Б

26-05-2021

2В

26-05-2021

3

26-05-2021

3A

20-05-2021

4

09-06-2021

5

09-06-2021

8

22-06-2021

9

01-01-1970

10

22-06-2021

16

21-06-2021

17

21-06-2021

13

21-06-2021

7

09-06-2021

12

21-06-2021

29

21-06-2021

28

21-06-2021

27

21-06-2021

26

01-01-1970

25

21-06-2021

24

21-06-2021

23

21-06-2021

20

21-06-2021

Situation

Before the start of construction works
After competition of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint